Solar & renewable installer websites in Belfast — page 1 of Google in 90 days, guaranteed.
Websites and local SEO for solar, heat pump and battery installers in Belfast. Northern Ireland has its own grant landscape (NI Sustainable Energy Programme) and most UK-wide installer sites get the references wrong — local installers can exploit that.
7-day free trial · Website builds from £999 · Cancel any time · UK-based
Why installers in Belfast need this
NI Sustainable Energy Programme grants and the broader Northern Ireland grant landscape work differently from the rest of the UK. National installer brands routinely list the wrong schemes on their Belfast pages, which is a credibility hit any local installer can capitalise on.
A Belfast site that gets the grant references right, names the right postcodes, and is built around Belfast, Lisburn and Bangor as separate towns will rank — fast, because the competition here is even thinner than Sheffield.
How the guarantee works
Day 0 — we agree the keyword (e.g. "solar installers belfast").
You and your account lead agree the keyword and town in writing before any work starts. That's the only target the guarantee tracks.
Day 1–30 — setup.
Technical audit, new site (if needed), GBP claimed and optimised, citation cleanup, on-page SEO, schema, sitemap, analytics.
Day 31–90 — ongoing local SEO.
Weekly GBP posts, monthly blog content, citations across Northern Ireland, internal linking. You get a weekly rank report.
Day 90 — we hit it, or we refund.
Page 1 organic or top 3 Local Pack on a UK-IP incognito search. If we miss, full refund of all 3 monthly payments (£450). Cancel any time before then and we just stop charging — but the guarantee requires staying the full 3 months.
What's included
- Custom website build (not a template)
- Pages optimised for Belfast + Lisburn, Bangor, Newtownabbey
- Google Business Profile claim & full optimisation
- LocalBusiness, Service & FAQ schema markup
- 30+ UK citations (Yell, Bing Places, niche directories)
- Mobile speed score ≥ 90 on PageSpeed Insights
- Monthly blog post targeting a local long-tail keyword
- Weekly rank tracking + monthly report
- Honest review-velocity playbook (no fake reviews, ever)
- 12-month region exclusivity in your postcode area
Common questions from Belfast installers
How long until I rank for "solar installers belfast"?+
Most Belfast installers we work with hit page 1 inside 60 days. We give ourselves 90 days as the guarantee window, with a full refund if we miss. You see weekly rank movement in your monthly report.
I already have a website. Do I need a new one?+
Not always. We run a free audit first. If your existing site is fast, mobile-friendly and has the right structure, we keep it and do the SEO work on top. If it isn't, the cost of fixing it usually matches the cost of a new one — at which point a new site is the better call.
Do you only work with installers in Belfast itself?+
We cover the whole Northern Ireland area — Lisburn, Bangor, Newtownabbey, Carrickfergus and the surrounding towns. The site we build targets every postcode you actually take jobs in, not just your HQ.
What if I'm a heat pump or battery installer, not solar?+
Same playbook. We work with MCS-certified solar, heat pump, battery storage and EV charger installers. The keyword we guarantee changes ("heat pump installers belfast", "battery installer belfast"), the work doesn't.
How does the free trial work?+
You start with a 7-day free trial — we kick off the audit, GBP cleanup, and on-page work straight away. If you're not convinced by day 7, cancel and pay nothing. Otherwise it converts to £150/month for 3 months. Cancel any time after that too. Card captured upfront via Stripe so the trial can start the same day.
We also cover
Installers across Northern Ireland — including Lisburn, Bangor, Newtownabbey, Carrickfergus and Holywood. Postcode areas: BT.
See exactly where you rank in Belfast today.
Free 2-minute Loom on your Google Business Profile and current ranking. Sent within 24 hours. No call required.
Get my free Belfast audit